INSTALLATION - FINISHED LOOKS
The very first thing we did was to install the two compression fittings on the EISWAND 360 and then mount the tubes and the anti-kink springs.
Remember you don't have to cut the tubes in 4 pieces to install the quick-release connectors but they can come very handy if you plan on expanding the loop.
After that we mounted the 4 tall bars around the CPU and then installed the XP3 Light waterblock (of course we also mounted the other two compression fittings on it).
Once the tubes were connected via the quick-release connectors we started filling the reservoir (remember not to turn on the unit before you start filling the reservoir otherwise the pumps may get damaged) and continued doing so as it filled the loop (moving the tower around while doing so will help release air inside the loop). Though not very important i think we should point out that the reservoir has a white LED inside and not a blue one like its other parts.
When i first checked the base material i didn't think illumination would be very bright but i was wrong.