Page 5 of 9
INSTALLATION
As always, I start by mounting the radiator on top of the open-air test bench.
Next step is to place the backplate and mount the standoffs.
Placing the pump/waterblock combo with the 4 available thumbscrews is next.
The MasterLiquid 360 Atmos certainly looks great even without an LCD screen (short clip is available on TikTok and YouTube).