20 - 11 - 2024
Login Form



 


Share this post

Submit to FacebookSubmit to TwitterSubmit to LinkedIn

 

INSTALLATION

 

 

 

 

 

 

As always, I start by mounting the radiator on top of the open-air test bench.

 

 

Next step is to place the backplate and mount the standoffs.

 

 

Placing the pump/waterblock combo with the 4 available thumbscrews is next.

 

 

The MasterLiquid 360 Atmos certainly looks great even without an LCD screen (short clip is available on TikTok and YouTube).